Remove old bathtub or shower base and 1-3 rows of wall tiles as needed. Note (This project requires (depending on tiles sizes) that 1-3 rows of wall tiles be removed)
Install new bathtub or shower base that fits in same opening and connects to the existing plumbing without any plumbing modifications included (Note: For cast iron steel tub or shower base extra fee applies)
Install new removed wall tiles as needed and grout as needed
Caulk complete bathtub and shower walls
Clean and wash dust completely
Walk-through inspection
One-year labor warranty
Note: This project sometimes may also require that one row of floor tiles may also need to be removed and this is not included in this quote, if needed the extra cost will be estimated at time of job.
Customer To Supply:
Bathtub or shower base, Durock cement boards, matching tiles, color matching grout and color matching 100% silicone caulk
Quick Contact
Subscribe to our Newsletter
We're here to help. Check out our FAQs, send us an email or call us at 1 (800) 555-5555
Customer name the price custom described projects are accepted on a fairly price based offer and skill level requests. We will let you know if there are any discrepancies after submitting your project within 24 hours.
Remodeling products - How it works :
All Products Include the product, taxes, delivery to your home and proffesional installation.
We have compared and picked a limited number of the "Best Budget" and "Best Overall" mainstream products so you don't have to shift through a myriad of products and try deciding what's best, select a product that best fit your need and a rep will consult with you on all other product options before we proceed finalizing your work order.
Features
Customer to supply:
Custome saves money by supplying as many materials, parts and fixtures as possible for the project per the
"Customer to supply" list above. Some additional technical materials may also be needed for your project that
we might need to supply. If needed, these materials are charged as follows: store bought materials are charged
based on store receipt plus 20% mark up and, depending on distance, a delivery charge. Truck stock items are
charged a 20% mark up with no delivery charge.
Technical Materials:
Some minor technical materials may also be needed for your project that we might need to supply. If needed, these materials are charged as follows:
store bought materials are charged base on store receipt plus 20% mark up and, depending on distance, a delivery charge. Truck stock items are charged
a 20% mark up with no delivery charge.